I am an applied scientist passionate about utilizing statistical and computational modeling to bridge the gap between data and real-world impact. I recently completed my M.S. in Quantitative Ecology and Resource Management at the University of Washington, where I modeled disease transmission in clam populations using Bayesian methods. My background in statistics and data science from the University of Colorado provides the quantitative foundation for my work in statistical methods, computer science, and data analytics. I am currently working as a Sustainability Data Analyst at Deckers Brands, where I manage product and supply chain data to evaluate environmental impacts.
Metzger Lab, Pacific Northwest Research Institute
UW Master's thesis research developing a marine disease model to understand disease transmission dynamics in clam populations using Bayesian statistical methods and ecological modeling frameworks. Ongoing work is focused on preparing the thesis research for publication.
Identified and described stages of disease through changepoint and regression analyses in the Metzger Lab.
Developed changepoint detection methods for ecological time series data in the Peleg Lab. Contributed to field and laboratory experiments, with findings published in peer-reviewed literature.
Interactive dashboard exploring water sampling data around Washington with key statistical reporting.
Statistical modeling project analyzing relationships between environmental variables and salmon survival rates using generalized linear models and time series methods.
Developed predictive models for species distributions using machine learning techniques including random forests and gradient boosting.
Applied optimization techniques to identify the most effecient sampling route throughout the Puget Sound using linear and nonlinear programming.
Deveoped and analyzing a sea turtle migratory network using graph theory and network metrics to help direct conservation efforts.
Adding a random walk component to the standard agent-based models to understand emergent population patterns and introduced obstacles to test behavior.
Web app that schedules weekly pods, tracks rotating-partner points, and supports uploading/downloading schedule and results for league continuity.
SQL queries on renewable-relevant weather data from an API into a relational database for grid analysis.
Built a reporting pipeline (Excel → Python reshape → SQL mart) and a Power BI dashboard for quarterly waste system trends.
Completed training in statistical consulting and interdisciplinary data analysis at the Laboratory for Interdisciplinary Statistical Analysis. Collaborated with researchers from diverse fields to provide statistical guidance and analytical support.
Conducted lab and field sampling in marine and terrestrial systems across multiple research studies and institutes including the BioFrontiers Institute and the Pacific Northwest Research Institute. Gained hands-on experience in ecological data collection, species identification, and field methodology.
Provided data analysis, as well as scientific writing expertise, to a nonprofit environmental organization. Created data reports to present insights clearly in a storytelling manner using MS Suite.
Friday Harbor Lab seminar guest speaker, 2026
Ocean Sciences Meeting (OSM), 2026
Ecology and Evolution of Infectious Diseases (EEID) Conference, 2025
Society for Mathematical Biology (SMB) Conference, 2025
View PosterNSF-funded EEID Pre-Conference Workshop on AI, Travel Award (2025)
STANCON Scholarship (2024)
CU PIIE Program Award (2021)
Outside of research, you'll find me exploring the outdoors or traveling. I am passionate about hiking, skiing, scuba diving, photography, and spending time on the water. These experiences fuel my curiosity about the natural world and remind me why conservation matters.